Gran Alacant Forum
Gran Alacant Forum => Local Services, Builders, Installers etc. => Topic started by: BeachLife on February 02, 2016, 22:41.
-
The new pool hole is dug !!
(Thanks to Bruce and Moira for the pics)
-
Thanks for the update Rich (also Bruce & Moira),
We are over soon, so will take a few photos!
Joe
-
More progress
(http://uploads.tapatalk-cdn.com/20160206/b03d70d95f862a01b174729b702bacbb.jpg)(http://uploads.tapatalk-cdn.com/20160206/1d74cd6d0e56c6d0656e7700794c7c42.jpg)(http://uploads.tapatalk-cdn.com/20160206/4846fe112c1454f63ae3938e52db40d1.jpg)
Sent from my iPhone via Tapatalk
-
Fingers crossed that this is the end of 'pool gate' once and for all.
Joe
-
Were not on this urb,but out of interest is this a new pool or replacement for an existing pool. And what is pool gate sound a bit inintriguing
-
This is a replacement pool and the over the years the urb has experienced a number of problems with previous pool. The pool was out of action for a number of weeks last June /July due to problems.
-
Good progress:
Just a note (if you havent had a email from the 3.2G administrator) - the top layer of tarmac is finally being put down on March 7th. About time after 9 years of the house building work being finished !
-
This weeks update:
(thanks Bruce and Moira)
-
A few more updates from this weekend:
(http://uploads.tapatalk-cdn.com/20160229/2ac1725e65df27cf669ac5d6970eb43d.jpg)(http://uploads.tapatalk-cdn.com/20160229/890dd39df5fa6a498b6222300e21296e.jpg)(http://uploads.tapatalk-cdn.com/20160229/5dbc37a57dec72497733d1cd82fe738c.jpg)
Sent from my iPhone via Tapatalk
-
Top surface started today !(http://uploads.tapatalk-cdn.com/20160329/8e2a427df5a4f8cab37dd21af5289fee.jpg)
(http://uploads.tapatalk-cdn.com/20160329/8d32810faafcc2808e4622dc4dce0249.jpg)
Sent from my iPhone via Tapatalk
-
Weather looks great, meanwhile in uk it's rained most of day what a surprise. Which urb is that, carabassi?
-
The Urb is 3.2G which is if you turn right at the new white apartments when you come up from the beach :)
BW
Maricia
-
Weather looks great, meanwhile in uk it's rained most of day what a surprise. Which urb is that, carabassi?
The roads below the school were finished off yesterday, and what a lovely job they've done.
-
The road on the photos posted by Rich and Sue runs between 3.2A and 3.2G. 3.2A is on the left in the top photo and on the right in the 2nd, with obviously 3.2G opposite.
-
Pics taken this week of pool progress. Concrete laid yesterday. Looking good. One slight concern - the strange slope just below the bottom step ?. When under water is this going to cause people to slip as its directly where you will step down into the pool. ??.
-
Just about all done - looks impressive. (http://uploads.tapatalk-cdn.com/20160507/83743f93e183182f7afe8b47e0578260.jpg)(http://uploads.tapatalk-cdn.com/20160507/af32b986dc1c33a7e67b5f7fd6cf3559.jpg)(http://uploads.tapatalk-cdn.com/20160507/7436ca48a6381430c4c5357cc7d9d1eb.jpg)(http://uploads.tapatalk-cdn.com/20160507/2d21e4322cd522bab4a180a6613ef017.jpg)
Sent from my iPhone via Tapatalk
-
thanks for pics Rich.... we are out on thursday is the pool up & running...ian/irene
-
I think the chemicals have just gone in - the water is also "Baltic" - Id give it a week or so